Sunday, 5 December 2010

Slowly but maybe surely

The wintry conditions have meant that everyone's heating is breaking down and plumbers are a bit like Rocking Horse Pooh. Consequently, progress on the wetroom has been painfully slow. However. We do have a little bit of progress - much of it hidden pipework, but something to see all the same.
For those with an interest in the obscure; this is a wetroom floor former. The slit is not, apparently for posting letters.


The slit is for the drainage channel (cover leaning against the wall) which is under the box of tiles, which are, crucially, holding the whole thing in place whilst the concrete goes off over the weekend.

In the mean time, Husband has been busy removing the remainder of the tiles, adhesive and PVAing the walls in preparation for tiling.

The 'promise' is of much activity this week. However, looking at the temperature tonight (currently -8.8'c), we suspect the activity may be elsewhere!

1 comment:

  1. and the whole house continues to be turned upside down ....

    ReplyDelete

Thank you for looking and if you would like to leave a message please be aware that it will come to me for moderation before it is published